Location

STEW310

Session Number

159

Session Title

South Bend Smart Streets: Before and After Study

Track Title

Traffic Operations

Event Description/Abstract

The South Bend Smart Streets project, which was completed in the summer of 2017, utilized road diets and the Complete Streets philosophy to transform the way citizens navigate the downtown South Bend area. Traffic analysis was performed both prior to and after construction to guide the design process and to retime 30+ traffic signals located within the project study area. This presentation provides a beforeand-after comparison of traffic conditions and the lessons learned.

Share

COinS
 
Mar 7th, 8:00 AM Mar 7th, 8:50 AM

South Bend Smart Streets Before & After Study

STEW310

The South Bend Smart Streets project, which was completed in the summer of 2017, utilized road diets and the Complete Streets philosophy to transform the way citizens navigate the downtown South Bend area. Traffic analysis was performed both prior to and after construction to guide the design process and to retime 30+ traffic signals located within the project study area. This presentation provides a beforeand-after comparison of traffic conditions and the lessons learned.