Abstract
This presentation details the accelerated construction of the I-70 over Indiana SR 121 bridges and includes a brief history of the funding roles of INDOT and FHWA and the designer contract documents. The construction engineering methodology and step-by-step construction sequence will be detailed, with construction decisions for the slide, bridge demolition, bridge slide operations, and project completion.
Session Number
2
Session Title
I-70 Over SR 121 Bridge Slide
Track Title
Bridges
Location
STEW206
Date of Version
March 2018
Recommended Citation
Gorak, Kevin and Jerrell, Pete, "I-70 Over SR 121 Bridge Slide" (2018). Purdue Road School. 2.
https://docs.lib.purdue.edu/roadschool/2018/presentations/2
Start Date
3-6-2018 1:00 PM
End Date
3-6-2018 1:50 PM
I-70 Over SR 121 Bridge Slide
STEW206
This presentation details the accelerated construction of the I-70 over Indiana SR 121 bridges and includes a brief history of the funding roles of INDOT and FHWA and the designer contract documents. The construction engineering methodology and step-by-step construction sequence will be detailed, with construction decisions for the slide, bridge demolition, bridge slide operations, and project completion.