Abstract

The aim of this research was to increase the use of the accelerated bridge construction (ABC) and accelerated bridge fabrication (ABF) in Indiana. Specific research objectives included: (1) understand barriers to implementing ABC and evaluate ABF capabilities in Indiana, (2) investigate the benefits and limits of various ABC/ABF strategies specific to Indiana, and (3) develop guidelines and recommendations for implementing ABC/ABF in Indiana. The focus was on the scoping stage, with the goal of triggering which projects are candidates for ABC or ABF early in the process. Research culminated in (1) a system-level analysis tool that scores all bridges in the Indiana bridge inventory according to their potential for ABC and (2) a site-specific decision-making flowchart to be used at an early stage of design for a specific bridge.

Keywords

accelerated bridge construction, rapid fabrication

Report Number

FHWA/IN/JTRP-2025/12

SPR Number

4843

Performing Organization

Joint Transportation Research Program

Publisher Place

West Lafayette, Indiana

Date of Version

2025

DOI

10.5703/1288284317858

SPR-4843 Technical Summary.pdf (1806 kB)
SPR-4843 Technical Summary

Share

COinS