Abstract

The final link in Plainfield’s Northwest Perimeter Parkway posed a challenge with poor soils. Designers faced a thick layer of organic material beneath an embankment road section and four-sided box culvert, introducing a risk of settlement under construction loads. This presentation will discuss the challenges and how the proposed solution exceeded expectations.

Session Number

14

Session Title

Marl Madness: Plainfield’s Slam Dunk Solution

Track Title

DESIGN/CONSTRUCTION

Location

FOWLER HALL

Date of Version

2026

Start Date

3-17-2026 3:00 PM

End Date

3-17-2026 3:50 PM

Share

COinS
 
Mar 17th, 3:00 PM Mar 17th, 3:50 PM

Marl Madness: Plainfield’s Slam Dunk Solution

FOWLER HALL

The final link in Plainfield’s Northwest Perimeter Parkway posed a challenge with poor soils. Designers faced a thick layer of organic material beneath an embankment road section and four-sided box culvert, introducing a risk of settlement under construction loads. This presentation will discuss the challenges and how the proposed solution exceeded expectations.