US 33 Over Blue River: ABC’s With Steel

Track Title

Bridges

Event Description/Abstract

The US 33 over the Blue River Bridge Replacement project is the first INDOT project of its kind, and a great example of Accelerated Bridge Construction (ABC). The project used prefabricated steel beam modular super- structure units with prefabricated substructure units, approach slabs, terminal joints, and “steel-like” UHPC for the 8-inch closure pours. Correcting the substan- dard roadway superelevation added complexity to the design and detailing. Join us to learn more.

Share

COinS
 
Mar 12th, 11:00 AM Mar 12th, 11:50 AM

US 33 Over Blue River: ABC’s With Steel

CL50 224

The US 33 over the Blue River Bridge Replacement project is the first INDOT project of its kind, and a great example of Accelerated Bridge Construction (ABC). The project used prefabricated steel beam modular super- structure units with prefabricated substructure units, approach slabs, terminal joints, and “steel-like” UHPC for the 8-inch closure pours. Correcting the substan- dard roadway superelevation added complexity to the design and detailing. Join us to learn more.