The Greensburg Municipal Airport completed the construction of Runway 1-19 on a new alignment in 2022. Runway 1-19 is 5,405-ft long × 100-ft wide and replaced the existing Runway 18-36 that was 3,430-ft long × 40-ft wide. This was a multi-year construction project with a broad scope that included land acquisition; construction in a flood-way; grading and drainage; paving and electrical; and extensive FAA coordination. Challenges and successes will be discussed.
Session Number
82
Session Title
Challenges and Successes: The Runway 1-19 Project and Drone Usage in Construction
Track Title
Aviation
Location
STEW 218 CD
Date of Version
March 2024
Recommended Citation
Feister, John and Books, Jeremy, "Runway 1-19: Greensburg Municipal Airport’s New 5,405-ft Runway:" (2024). Purdue Road School. 35.
https://docs.lib.purdue.edu/roadschool/2024/presentations/35
Start Date
3-13-2024 8:00 AM
End Date
3-13-2024 8:50 AM
Included in
Runway 1-19: Greensburg Municipal Airport’s New 5,405-ft Runway:
STEW 218 CD
The Greensburg Municipal Airport completed the construction of Runway 1-19 on a new alignment in 2022. Runway 1-19 is 5,405-ft long × 100-ft wide and replaced the existing Runway 18-36 that was 3,430-ft long × 40-ft wide. This was a multi-year construction project with a broad scope that included land acquisition; construction in a flood-way; grading and drainage; paving and electrical; and extensive FAA coordination. Challenges and successes will be discussed.