Abstract

A bridge replacement project on SR 337 over Lost River encountered karst features during foundation design, which ended up altering the preliminary span arrangement and overall bridge length. Through geophysical assessment, a large void was discovered under the bridge location, particularly the preliminary pier location. Construction updates, lessons learned, and perspectives on project challenges and solutions will be shared by a bridge designer and consultant project manager.

Session Number

91

Session Title

Oh Karst! Lost River Bridge Replacement

Track Title

Bridges

Location

STEW 206

Date of Version

March 2023

Start Date

3-15-2023 3:00 PM

End Date

3-15-2023 3:50 PM

Share

COinS
 
Mar 15th, 3:00 PM Mar 15th, 3:50 PM

Oh Karst! Lost River Bridge Replacement

STEW 206

A bridge replacement project on SR 337 over Lost River encountered karst features during foundation design, which ended up altering the preliminary span arrangement and overall bridge length. Through geophysical assessment, a large void was discovered under the bridge location, particularly the preliminary pier location. Construction updates, lessons learned, and perspectives on project challenges and solutions will be shared by a bridge designer and consultant project manager.