Session Title

Post Installation Inspection for All Storm Drain Pipes

Track Title

Stormwater and Wetlands

Event Description/Abstract

This session teaches common practices to protect the owner’s best interest by ensuring all storm drain and culvert pipes in their system have been properly installed and that the pipeline system is uncompromised. Post installation inspection (PII) provides the owner with the information needed to determine if proper installation occurred prior to project close-out or final acceptance.

Share

COinS
 
Mar 15th, 1:00 PM Mar 15th, 1:50 PM

Post Installation Inspection for All Storm Drain Pipes

STEW 278

This session teaches common practices to protect the owner’s best interest by ensuring all storm drain and culvert pipes in their system have been properly installed and that the pipeline system is uncompromised. Post installation inspection (PII) provides the owner with the information needed to determine if proper installation occurred prior to project close-out or final acceptance.