Post Installation Inspection for All Storm Drain Pipes
Track Title
Stormwater and Wetlands
Event Description/Abstract
This session teaches common practices to protect the owner’s best interest by ensuring all storm drain and culvert pipes in their system have been properly installed and that the pipeline system is uncompromised. Post installation inspection (PII) provides the owner with the information needed to determine if proper installation occurred prior to project close-out or final acceptance.
Post Installation Inspection for All Storm Drain Pipes
STEW 278
This session teaches common practices to protect the owner’s best interest by ensuring all storm drain and culvert pipes in their system have been properly installed and that the pipeline system is uncompromised. Post installation inspection (PII) provides the owner with the information needed to determine if proper installation occurred prior to project close-out or final acceptance.