Abstract
The presentation will address the challenges of load rating bridges without plans and how a four-step procedure can be used to guide the engineer in determining bridge ratings for poorly documented bridges. The procedure is illustrated through the assessment of an earth-en-filled reinforced concrete arch bridge with no available bridge information.
Session Number
3
Session Title
Load Rating of Bridges Without Plans
Track Title
Bridges
Location
STEW 206
Date of Version
March 2020
Start Date
3-10-2020 3:00 PM
End Date
3-10-2020 3:50 PM
Load Rating of Bridges Without Plans
STEW 206
The presentation will address the challenges of load rating bridges without plans and how a four-step procedure can be used to guide the engineer in determining bridge ratings for poorly documented bridges. The procedure is illustrated through the assessment of an earth-en-filled reinforced concrete arch bridge with no available bridge information.