Abstract

This presentation introduces and summarizes SPR-4230 (Alternative Quality Assurance Methods for Compacted Subgrade), which aims to establish performance-based QA test methods for subgrade treatment construction. The presenter will review the current state of subgrade treatment QA testing methods and then discuss proposed QA testing methods that SPR-4230 is currently assessing. Because SPR-4230 is not scheduled for completion until March 2020, preliminary results and future work for the project will be presented.

Session Number

31

Session Title

Quality Assurance Methods for Subgrade Treatment Construction

Track Title

Pavements

Location

PMU250/FACW

Date of Version

March 2019

Start Date

3-5-2019 3:00 PM

End Date

3-5-2019 3:50 PM

Share

COinS
 
Mar 5th, 3:00 PM Mar 5th, 3:50 PM

SPR-4230: Alternative Quality Assurance Methods for Compacted Subgrade

PMU250/FACW

This presentation introduces and summarizes SPR-4230 (Alternative Quality Assurance Methods for Compacted Subgrade), which aims to establish performance-based QA test methods for subgrade treatment construction. The presenter will review the current state of subgrade treatment QA testing methods and then discuss proposed QA testing methods that SPR-4230 is currently assessing. Because SPR-4230 is not scheduled for completion until March 2020, preliminary results and future work for the project will be presented.