Abstract
During the record rainfalls of June 2015, a steeply wooded rural section of SR 105 in Huntington County experienced a side slope failure causing portions of the southbound lane to break off and drop more than a foot overnight. In this session we walk through the solution as well as the steps taken to expedite and complete design, permitting, right-of-way acquisition, and construction within a time frame of 13 months.
Session Number
93
Session Title
Slide Correction Case Study: SR 105 in Huntington County
Track Title
Design/Construction
Location
STEW 214AB
Date of Version
March 2017
Recommended Citation
Langmaid, John and Goins, Jennifer, "Slide Correction Case Study: SR 105 in Huntington County" (2017). Purdue Road School. 55.
https://docs.lib.purdue.edu/roadschool/2017/presentations/55
Start Date
3-8-2017 2:00 PM
End Date
3-8-2017 2:50 PM
Slide Correction Case Study: SR 105 in Huntington County
STEW 214AB
During the record rainfalls of June 2015, a steeply wooded rural section of SR 105 in Huntington County experienced a side slope failure causing portions of the southbound lane to break off and drop more than a foot overnight. In this session we walk through the solution as well as the steps taken to expedite and complete design, permitting, right-of-way acquisition, and construction within a time frame of 13 months.