Event Title
Location
STEW 214AB
Session Number
91
Session Title
"The Other Left": 96th Street @ Allisonville Road
Track Title
Design/Construction
Event Description/Abstract
This presentation documents the planning, design, construction, and operational effectiveness of the first full median u-turn intersection in the state of Indiana. The presentation contains a before-and-after study of the intersection, comparing operational measures of effectiveness prior to and 2 years subsequent to intersection construction. Safety, travel time, and LOS are highlighted.
"The Other Left": 96th Street/Allisonville Road
STEW 214AB
This presentation documents the planning, design, construction, and operational effectiveness of the first full median u-turn intersection in the state of Indiana. The presentation contains a before-and-after study of the intersection, comparing operational measures of effectiveness prior to and 2 years subsequent to intersection construction. Safety, travel time, and LOS are highlighted.