Abstract
This presentation documents the planning, design, construction, and operational effectiveness of the first full median u-turn intersection in the state of Indiana. The presentation contains a before-and-after study of the intersection, comparing operational measures of effectiveness prior to and 2 years subsequent to intersection construction. Safety, travel time, and LOS are highlighted.
Session Number
91
Session Title
"The Other Left": 96th Street @ Allisonville Road
Track Title
Design/Construction
Location
STEW 214AB
Date of Version
March 2017
Recommended Citation
Hill, Jeff; Henkel, Dave; and Rengel, Joe, ""The Other Left": 96th Street/Allisonville Road" (2017). Purdue Road School. 54.
https://docs.lib.purdue.edu/roadschool/2017/presentations/54
Start Date
3-8-2017 10:30 AM
End Date
3-8-2017 11:20 AM
"The Other Left": 96th Street/Allisonville Road
STEW 214AB
This presentation documents the planning, design, construction, and operational effectiveness of the first full median u-turn intersection in the state of Indiana. The presentation contains a before-and-after study of the intersection, comparing operational measures of effectiveness prior to and 2 years subsequent to intersection construction. Safety, travel time, and LOS are highlighted.