Abstract
Representatives of the Ohio River Bridges East End Crossing cable-stayed bridge owner’s and design-builder’s teams present on the challenges and successes of this signature P3 project in Louisville, Kentucky. The presentation focuses on construction engineering and execution of the bridge’s main river tower elements, as well as superstructure deck erection methodologies and construction cycles.
Session Number
8
Session Title
Ohio River Bridges East End Crossing Cable-Stayed Bridge Construction
Track Title
Bridges
Location
St. Thomas Newman Hall
Date of Version
March 2017
Recommended Citation
VanSlambrook, Doug; Woodruff, Shawn; and Soule, Ben, "Orb East End Crossing Cable-Stayed Bridge Construction" (2017). Purdue Road School. 41.
https://docs.lib.purdue.edu/roadschool/2017/presentations/41
Start Date
3-7-2017 4:00 PM
End Date
3-7-2017 4:50 PM
Orb East End Crossing Cable-Stayed Bridge Construction
St. Thomas Newman Hall
Representatives of the Ohio River Bridges East End Crossing cable-stayed bridge owner’s and design-builder’s teams present on the challenges and successes of this signature P3 project in Louisville, Kentucky. The presentation focuses on construction engineering and execution of the bridge’s main river tower elements, as well as superstructure deck erection methodologies and construction cycles.