Abstract

Establishing the bearing capacity of piles, piers, and shafts is difficult and expensive for engineers to determine. The Osterberg Load Cell allows geotechnical engineers to determine the capacity of drilled shafts, piers, and driven piles. It is used to test for the bearing and skin friction forces that can be developed in the soil through which the shaft, pier, or pile is placed.

Fact Sheet ID Number

CV05004

Sub-Area

Foundation

Keywords

osterberg load cell, pressure cell, excavation, drilled test, foundation

DOI

10.5703/1288284315791

Date of this Version

1-1-2007

Share

COinS
 
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.