Location

STEW 206

Start Date

19-11-2026 1:00 PM

End Date

19-11-2026 1:50 PM

Description

The Geotechnical investigation limitation requires the Engineer to make assumptions to design the project and develop construction procedures without full knowledge of what might be encountered in soil borings. The suitable subsurface instrumentation can reduce these uncertainties and can aid in the selection of appropriate field equipment and construction procedures. Subsurface instrumentation is typically utilized during the design phase or the construction phase. During the design phase, field instrumentation can be utilized for the following purposes: Established soil and rock profile along with ground water elevation, Bearing capacity of the proposed structure, Load response of soils and rock, Risk prediction, Natural calamities such as seismic, flooding, and soil types. During construction instruments are installed to monitor the following: Design validation and stage construction monitoring, Construction quality control and following designer’s recommendations, Research results validation, and to ensure correction efficiency.

Share

COinS
 
Nov 19th, 1:00 PM Nov 19th, 1:50 PM

INDOT Geotechnical Instrumentation

STEW 206

The Geotechnical investigation limitation requires the Engineer to make assumptions to design the project and develop construction procedures without full knowledge of what might be encountered in soil borings. The suitable subsurface instrumentation can reduce these uncertainties and can aid in the selection of appropriate field equipment and construction procedures. Subsurface instrumentation is typically utilized during the design phase or the construction phase. During the design phase, field instrumentation can be utilized for the following purposes: Established soil and rock profile along with ground water elevation, Bearing capacity of the proposed structure, Load response of soils and rock, Risk prediction, Natural calamities such as seismic, flooding, and soil types. During construction instruments are installed to monitor the following: Design validation and stage construction monitoring, Construction quality control and following designer’s recommendations, Research results validation, and to ensure correction efficiency.