Event Description/Abstract

A runway extension at the Portland Airport was recently opened to traffic and was the culmination of well over a decade of effort. The project presented numerous engineering challenges beyond design, such as environmental approval, land acquisition, and ditch mitigation. Phase I required the enclosure of Alexander Ditch and substantial soil for grading the site. Phase II included the paving and lighting of the runway and taxiway extensions. Join us for a discussion of this project.

Share

COinS
 
Mar 15th, 8:00 AM Mar 15th, 8:50 AM

Portland Airport Runway Extension: Challenges and Successes

STEW 202

A runway extension at the Portland Airport was recently opened to traffic and was the culmination of well over a decade of effort. The project presented numerous engineering challenges beyond design, such as environmental approval, land acquisition, and ditch mitigation. Phase I required the enclosure of Alexander Ditch and substantial soil for grading the site. Phase II included the paving and lighting of the runway and taxiway extensions. Join us for a discussion of this project.