Event Description/Abstract

At the 2014 Road School, this presentation focused on the proposed sliding of the Milton-Madison Bridge, a 15000 ton truss superstructure intended to move laterally 55 feet from a temporary location onto permanent piers. The project was a joint procurement between INDOT and KYTC, with a Design/Build team consisting of Walsh Construction, Buckland and Taylor, and Burgess and Niple performing the slide. The presentation was in early March, with the slide scheduled for later in the month. The slide will be the largest of its kind.

Share

COinS
 
Mar 12th, 12:00 AM

2014 Road School

At the 2014 Road School, this presentation focused on the proposed sliding of the Milton-Madison Bridge, a 15000 ton truss superstructure intended to move laterally 55 feet from a temporary location onto permanent piers. The project was a joint procurement between INDOT and KYTC, with a Design/Build team consisting of Walsh Construction, Buckland and Taylor, and Burgess and Niple performing the slide. The presentation was in early March, with the slide scheduled for later in the month. The slide will be the largest of its kind.