Session Title

Red Flag Analysis/Investigations

Track Title

MPO

Event Description/Abstract

Early project-level environmental analysis can save time and money. A Red Flag Analysis reveals possible environmental issues prior to the start of the design process and adds greater certainty to the design and budgeting process. The analysis can be done as part of the long-range transportation plan or at the pre-design project level.

Share

COinS
 
Mar 5th, 12:00 AM

2040 Metropolitan Transportation Plan:Tippecanoe County Red Flag Analysis

STEW 322

Early project-level environmental analysis can save time and money. A Red Flag Analysis reveals possible environmental issues prior to the start of the design process and adds greater certainty to the design and budgeting process. The analysis can be done as part of the long-range transportation plan or at the pre-design project level.