Abstract
The design build team will provide an overview of the Madison Milton Ohio River Bridge Project construction. There will be a brief discussion of the design-build process. Specific discussions of the retrofits to the existing caissons and piers that allowed for the existing substructure to be reused as well as discussions of the truss design, erection, span lifts, and sliding will be provided.
Session Number
67
Session Title
Madison Milton Design Build Bridge Construction
Track Title
Bridge
Location
STEW 306
Date of Version
March 2013
Recommended Citation
Johnson, Murray, "Madison Milton Design Build Bridge Construction" (2013). Purdue Road School. 25.
https://docs.lib.purdue.edu/roadschool/2013/presentations/25
Start Date
3-6-2013 12:00 AM
Included in
Madison Milton Design Build Bridge Construction
STEW 306
The design build team will provide an overview of the Madison Milton Ohio River Bridge Project construction. There will be a brief discussion of the design-build process. Specific discussions of the retrofits to the existing caissons and piers that allowed for the existing substructure to be reused as well as discussions of the truss design, erection, span lifts, and sliding will be provided.