Abstract

The Admiral Clarey Bridge, includes a 100 ft long causeway, a 400 ft long fixed trestle and a 1035 ft long moveable section that includes the transition and floating drawspan. The fixed spans include a low level section as well as a high level section to allow a small boat channel. Floating structures, with a modular and repetitive configuration, provide the classic precasting opportunity for multiple reuses of the concrete formwork. This will reduce forming costs, produce nearly identical finished pieces, smooth surfaces, and easy fit-up and assembly.

Fact Sheet ID Number

CV02033

Sub-Area

Composite Materials & Technologies

Keywords

segmental precast floating draw span, low profile bridge, navigation channel

DOI

10.5703/1288284315751

Date of this Version

1-1-2007

Share

COinS
 
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.