Abstract

Even though heavy construction equipment such as a crane or backhoe excavator, is used to perform the task of pipe laying in the trench, workers are required to be inside the trench to guide the excavation, pipe laying, and final alignment. Work place safety has become a major concern in the construction industry over the past few decades, and trench cave-ins have caused serious and often fatal injuries to workers in the United States. The Construction Automation and Robotics Laboratory(CARL) at North Carolina State University has developed an alternative which involves advanced new technology: the prototype robotic excavation and pipe installation system.

Fact Sheet ID Number

CV10001

Sub-Area

Trenchless Technologies

Keywords

pipeman, safety, trench, 3d spatial positioning system, construction

DOI

10.5703/1288284315810

Date of this Version

1-1-2007

Share

COinS
 
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.