This report is intended to provide county bridge officials a simple, straight forward method to estimate the costs of replacing county bridges. The report uses information from bridges constructed from 1997 through 2005, which was obtained through surveys completed by Indiana counties. Regressions were performed on the data and a spreadsheet prepared that allows users to input Average Daily Traffic (ADT) and the old bridge length to obtain an estimate for the cost of a replacement bridge.